There should be a contractor in the park this week putting in a couple of field drains across the wiggly path to prevent the surface washing away in heavy rain.
The contractor will also be installing a seat at the Caldercuilt Road end of the wiggly path, looking into the park. An early christmas present for us all! 🙂